Permit Period 2019 – 2024
3.2.1 Utlity Bill Insert, Self-Service materials, and/or mailouts
3.2.3 Classroom Presentations
Date | School Name | # of Students |
3.2.5 Brochures & Videos
3.2.6 Signage
3.2.7 Community Outreach
3.2.8 Watershed Education
3.2.9 Public Meetings
3.2.10. Advisory Workgroup
3.2.11 Hotline
-
Storm Water Hotline: (956) 784-8131
4.2.1 Sewer Map
4.2.2 Illicit Discharge Elimination Ordinance
4.2.3 Business Education
4.2.4 Illicit Discharge Inspections
4.2.5 Business Site Inspections
4.2.6 Household Hazardous Waste
4.2.7 Source Investigation and Elimination
4.2.8 Hotline
-
Storm Water Hotline: (956) 784-8131
5.2.1 Erosion Control Ordinance
5.2.2 Construction Site Plan Review and Oversight
5.2.3 Site Inspection and Policy Enforcement
5.2.4 Training for Regulated Community
5.2.5 Construction Site Waste Management
5.2.6 Provide Construction BMP Outreach Program
6.2.1 Post-Construction Ordinance
6.2.2 Drainage Design Policy
6.2.3 BMP Maintenance
6.2.4 Land Use Plan
7.2.1 Stormwater Sewer System O&M
7.2.2 Street Sweeping
7.2.3 Employee Training
7.2.4 SOP Program and Pollution Prevention Measures
7.2.5 Site Visits/Inspections
7.2.6 Collection and Disposal of Stormwater Waste
Permit Period 2014 – 2018
ANNUAL REPORT
MS4 Annual Report Requirements
FINAL
SIGNATURES
Alamo
Alton
Brownsville
Cameron County
Donna
Edinburg
La Feria
La Joya
Los Fresnos
Mission
Palmview
Primera
San Benito
San Juan
Weslaco
ANNUAL REPORT
SIGNATURES
Alamo
Alton
Brownsville
Cameron County
Donna
Edinburg
La Feria
La Joya
Los Fresnos
Mission
Palmview
Primera
San Benito
San Juan
Weslaco
MCM 3 – Construction
5.2.0 Assess existing Construction Site Stormwater Control program
5.2.1 Erosion Control Ordinance
5.2.2 Construction Site Plan Review and Oversight
5.2.3 Site Inspection and Policy Enforcement
5.2.4 Training for regulated community
5.2.5 Construction Site Waste Management
5.2.6 Provide Construction BMP outreach program